Undertaking new projects for the 02 bid section of the south extension line of Wuxi Metro Line 1

2025-11-05 11:00

pexels-photo-169677.jpeg


Beautiful Wuxi, building dreams with me.


Shanghai Yechao assisted China Railway Shanghai Engineering Bureau in the construction of the 02 section of the southern extension of Wuxi Metro Line 1, which is under the protection of the driver.


The left line of the shield tunneling section from Wanda City Station to Nanquan Station on the southern extension of Wuxi Metro Line 1, constructed by China Railway Shanghai Engineering Bureau, has successfully started at the foot of Xuelang Mountain in Wanda Cultural Tourism City. This is another shield tunneling machine starting from the right line on June 16th, and also the last shield tunneling section of Line 1 Phase II project. This shield tunneling marks the comprehensive entry of Line 1 Phase II project into the excavation construction stage.


In order to ensure the smooth launch of the shield tunneling machine, all the employees of Shanghai Yechao Project Department worked together with full enthusiasm in a short period of time to successfully complete the construction process of the shield tunneling machine.


It is reported that the total length of the left line of the shield tunnel section from Wanda City Station to Nanquan Station is about 1555.777 meters. The tunnel passes through soil layers mainly composed of clayey silt and silty clay. A Herrenknecht earth pressure balance shield machine is used for excavation construction, starting from the west end of Wanda City Station. After completing the minimum radius turns of 600 meters and 350 meters in the section, it has now been received.

Address:No. 4645 Cao'an Road, Jiading District, Shanghai
Tel:86-021-66082406 66082407
Fax:86-021-66082405
迭部县| 交口县| 广平县| 新巴尔虎右旗| 丰顺县| 绩溪县| 本溪| 潼南县| 永顺县| 上高县| 清苑县| 华蓥市| 翼城县| 梅州市| 皮山县| 平度市| 香格里拉县| 常宁市| 恭城| 莲花县| 城固县| 乌拉特后旗| 永川市| 河曲县| 古田县| 旺苍县| 荃湾区| 金湖县| 渑池县| 南华县| 观塘区| 神池县| 东阳市| 乐昌市| 汉源县| 会宁县| 新民市| 瓦房店市| 万年县| 平邑县| 紫金县|